White Construction uses bagged concrete for post-frame building footers

We order 80 lb. bags of concrete by the tractor-trailer load!

By ordering such a large quantity of concrete at one time, we are able to get a better price on that product.

We can then extend those savings to our customers.

Our 80 pound bags of concrete are used for footers in the bottom of holes.  This is what our treated posts sit on.

Our 4″ thick concrete foundations are poured with pre-mixed concrete rated at 4,000 psi.

As an added service our foundations can be reinforced with 30 pounds of steel fibers per cubic yard.

Ready to start your project?

Fill out a form to let us know your building needs and we’ll get in touch with you for a quote. Once scheduled, your new Post-Frame building can be ready to use in as little as two weeks!